Acceptance of the three major security guards is victory

During the renovation, the main work the owner did was to supervise the construction and quality acceptance. Whether it is the supervision of construction or acceptance after completion, the owner needs to understand certain decoration knowledge. The quality of decoration will affect the safety and quality of your future home life, and you will have a reliable home for the “three levels”.

Nothing in the first customs clearance material acceptance

The first step in acceptance work is acceptance of the material. When signing a contract with a customer, a formal decoration company will sign a material declaration sheet at the same time, detailing the brands, specifications, and quality levels of the required materials. Both parties shall check the materials according to the material specification. Due to the limited space at the construction site, the material will be checked and accepted several times. In general, the materials to be inspected before construction include pipes, wires, planks, putties, cement, sand, etc., and ceramics, paints, and coatings will be gradually accepted as the project progresses.

The time of acceptance of the agreed materials: After the materials are purchased, the purchaser shall notify the other party to the contract to prepare for the acceptance of the materials, preferably when the materials enter the market. The agreed acceptance time is very necessary to avoid material entry, the other party does not have time to accept the material, affecting the construction progress.

The acceptance person stipulated in the contract must be on the scene: both the person in the home improvement industry and the consumer should take it seriously so as to avoid unnecessary troubles or disputes later.

The acceptance procedure shall be strict: the inspector shall conduct necessary inspections for each material agreement stipulated in the contract, such as brand, quality, specification and quantity.

The inspector specified in the contract shall sign the acceptance checklist: If the inspection result material is qualified, the inspector shall sign the material acceptance checklist. If the owner finds that the entry materials are inconsistent with the contractual requirements, he may refuse to sign the material acceptance form until he negotiates with the home improvement company for resolution.

The second round of defense and key acceptance of hidden projects

The supervising engineer introduced that when the concealment project is carried out or completed, it is necessary to carry out a mid-term key acceptance. This is particularly important for ensuring the overall quality of home improvement. The acceptance of the concealed project will affect the performance of multiple home improvement projects in the later period. General home improvement can be carried out about 15 days for mid-term acceptance (villa construction time is relatively long), can be divided into two, the first acceptance involves ceilings, water circuits, wood products and other items, the second acceptance is specifically for home improvement Use a waterproof room for inspection. If you find a problem or want to make some partial changes, it is best to present it in this stage in a timely manner.

Circuit modification: When the circuit is checked, it must be noted whether the wire used is the designated brand and whether the wire is up to standard. The non-compliance of wires has the condition of thin blister cores or coarse copper cores. These two non-compliant wires have an impact on the current load, which leads to potential safety problems for the owners in future use. When checking the circuit modification, check the closed condition of the socket. If the original socket has been displaced, carry out moisture-proof and waterproof treatment at the shifting position, and apply a waterproof tape over 3 layers for sealing. Also check that the circuit joints in the ceiling are also treated with waterproof tape.

Waterway reconstruction: The test of the waterway reform is mainly to conduct pressure test. When the pressure is applied, the pressure should not be less than 6kg. The pressure can not be less than 15 minutes. Then check whether the pressure gauge has pressure relief. If there is pressure relief, check the valve. Closed, if there is a pipe leak problem to be processed before the next construction.

Waterproof: Generally, the room where the floor drain is installed should be waterproofed. The waterproofness not only affects the daily life of the owner, but also affects the interests of the neighbors downstairs. Closed water test is a common method for testing waterproofing in home improvement. When conducting a closed water test, the foreman needs to confirm the closed time with both the owner and the downstairs occupant, and then close the drain hole of the room to put water into the room (water level Not less than 3cm), after 24 hours to check or ask if there is leakage in the downstairs household.

Acceptance shower wall waterproof when you can first check the wall paint is uniform, there is no leakage brush phenomenon, in particular, check the yin and yang angle whether there is a leak brush, to avoid the yin and yang angle due to leaking brush waterproof coating and cause dampness and mildew. The waterproof height of the shower wall is usually about 1.8m, and the wall waterproof of other areas should be higher than 1.5m.

Construction acceptance

1 2 Next> Total 2 Page
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

This type is widely applied for asphalt shingle roof.It highlights the easy and fast installation with solar roof flashing group.SunRack roof flashing is water tight and durable and compatible. This installation can easily accomplished with wood or using the RPS aluminum mounts. As with anything mounted on your roof, make sure to ground the panels well and attach in a secure and watertight manner.


The Tile Replacement Mount provides a fast and easy way to install solar on tile roofs while protecting against water intrusion. Simply remove the tile and replace it with the Tile Replacement Mount. Works with all standard curved and flat tile roofs, and all standard rail-based racking systems. Flashed at both the deck and top levels, the Tile Replacement Mount is fully engineered to meet code requirements and industry best practices. The Tile Replacement Mount features our patented Elevated Water Seal technology for optimal waterproofing. Base mount sold separately from flashing and post.
Tile Roof Mounting Features
1.Versatile: Works with Flat, S-shaped and W-shaped tiles
2.Flexible: Works with all standard rail-based racking systems
3.Simple and clean: No time-consuming, messy tile grinding or cutting
4.Flashings pre-treated and ready for paint, if desired

Our Composition Shingle Roof has been installed on pitched roofs and flat roofs, and is available in clear or black finish. With only one tool required, our composition shingle roof mount is a quick installation. With the flashing and sealing washers, you can be sure of a water-tight seal to protect your roof.


Solar Mounting Brackets For Pitched Roof

Solar Mounting Brackets,Metal Roof Solar Mounting Systems,Solar Panel Roof Mounting Systems,Solar Panels Mounting Brackets

Hebei Honde Plastic & Metal Co., Ltd. , https://www.foundation-system.com