Clear packaging repair process list

If you don't have any plans for renovations yet, you have a lot of confusion about how to decorate. Take a look at this process and you may have some help.

Clearance process

1 Step: Before the construction team enters the site

2 Budget quotations Bargaining, signing a contract, paying the first construction fee

3 balconies, etc.

4 Apply for Gas Opening

5 Steps: Water and Electricity Construction

6 Construction team approached to open water and electricity materials

7 Purchasing hydropower accessories See list of hydropower materials

8 Order PPR hoses

9 Jointly negotiating the pipeline trend

10 Chiseling the wall to open the pipeline

11 Telephone contact PPR

12 rows of wires

13 row PPR tube

14 Electrical data specification and construction team see the electrical inventory related information and warranty card must be retained

15 Hidden project acceptance and second construction fee

16 Steps: Woodworking Cabinets First Measurement

17 Material procurement and masonry workmanship Carpentry Woodworking material list Purchase woodworking materials (accessories and plates) See carpentry materials list

18 Order ceiling materials

19 Flooring board

20 Door and Window Cover Production and Furniture Frame After Finished Door and Sliding Door Construction Team Provides Data

21 Ceiling (hall and room)

22 Making woodwork such as entrances and walls

23 hit the keel

24 Flooring

25 Bill of Materials Purchase (Lines, Door Locks, Glass, Tracks, etc.)

26 Baseboard production

27 door installation

28 Ceilings for kitchen and toilets

29 Steps: Mason Open Bill of Materials

30 Procurement Accessories and Wall Tiles, Waterproof Coatings See Mason List

31 waterproof production

32 Wall tiles

33 tiling

34 Procurement Kitchen Appliances

35 The second measurement of kitchen cabinets must provide electrical details

36 Purchasing Sanitary ware and faucets

37 Step: Painter's Bill of Materials See Painter's List Carpenter Shop Flooring, Furniture, and Construction

38 Purchasing Paint Materials for Third Project Payment

39 Wall Putty Putty

40 Door and Window Cover Paint

41 floor grinding

42 Floor paint

43 Wall Top Latex Paint

44 Steps: Waterman opens bill of materials See lamp fixture list Before floor paint begins to enter

45 Purchase Materials

46 Ware installation

47 Cabinet installation

48 Switch Installation Install before the last pass of latex paint

49 Lighting installation

50 Overall Acceptance of Designers, Supervisors, Party A and Party B

51 Construction settlement

Step 52: Finishing work Cleaning work

53 Purchasing curtains

54 purchasing furniture

55 Purchase Appliances

56 Purchasing Bedding and Living Goods

57 Moving house

Lacquer furniture Window furniture Renovation design Kitchen cabinets Glass bricks Cabinet doors Glass sliding doors Glass furniture Kitchen tiles Kitchen cabinets Doors Floor tiles Glass doors Kitchen glass Sliding doors Bathroom doors Bathroom ceiling materials Bathroom wall tiles Bathroom ceilings Bathroom design Toilets Waterproof bathroom Floor tiles Toilet sliding doors

The original smell-killer. When massaged between the hands under running water, will help to remove those stubborn smells which resist normal soap and water. Smell Killers are made out of a special high-grade stainless steel. Smell Killer  helps you in an easy and environmentally friendly way to get rid of the bad smell.

Smell Killer

Smell Killer,Kitchen Smell Killer,Refrigerator Smell Killer,Toilet Smell Killer

Eco Household Co. Ltd , http://www.eco-household.com