Vertical pipe pump operation method _ vertical pipe pump main operating procedures

The correct vertical pipe pump operation can not only reduce product wear and tear, improve work efficiency, but also ensure the production runs, we can see that vertical pipe pump operation is very useful. Next Xiaobian introduce you to the main vertical pipe pump operating procedures, I hope for your help! Vertical pipe pump operation method Vertical pipe pump main operating practices Vertical pipe pump operation method Vertical pipe pump main operation Procedures Preparation of vertical pipe pump to start 1, remove the debris around the pump, tighten the screws fastening the Department. 2, disc pump 5 to 6 laps, should be flexible, no noise and so on. 3, lubricating oil or grease, oil qualified, the oil level should be between 1 / 2-3 / 4, the grease should be added as required. 4, check all kinds of instruments, check the voltage meter, ammeter working conditions, check the pump import and export pressure gauge. 5, check the electrical equipment, grounding protection should be intact, three-phase insurance should be intact. 6, open the pump inlet and outlet valves, so that the pump is full of liquid, while the pump open the canister vent valve deflation, until see the fluid and then close the vent valve (or open the top of the pump to deflate deflate). Vertical pipeline pump start and run the inspection 1, start the motor, confirm the motor direction and the provisions of the same direction. 2, press the start button to make the current drop from the highest value, pump pressure rise stable, slowly open the outlet valve. 3, the control valve to adjust the pump flow and pump outlet pressure. 4, carefully observe the pump pressure, current changes to confirm the motor is working properly. 5, check the pump oil level is within the specified range. Stop the pump 1, press the stop button to stop the pump. 2, close the pump inlet and outlet valves. 3, if the pump stopped for a long time, you need to drain the residual liquid pump to prevent corrosion or frost cracked pump body. 4, motor or pump bearing smoke immediately stop pump 5, the current exceeds the rated value should immediately stop the pump, so as not to burn the motor. 6, a strong vibration occurred in the pump or pump response immediately stop pump. Vertical pipe pump operation method _ vertical pipe pump main operating procedures as described above, for your reference. (Editor: Li Juan)

Imported Premium White Carbon Black

Imported Premium White Carbon Black,Special Auxiliaries For Thermoplastics,Surface Modification Treatment,Premium White Carbon Black

Xingbang High Molecular Materials Co., Ltd. , https://www.chemicaladditive.com