New house renovation steps and processes to help you create a unique new house

As we all know, house decoration is a very troublesome and time-consuming project, therefore, before the renovation, we must first master the steps and processes of new house decoration , so that the house decoration has become very easy and pleasant. How is the new house renovated? Here we will introduce in detail: The new house renovation steps and processes, hope to help everyone.

New house renovation steps and processes:

1, pre-design

Before the renovation, it is necessary to determine the decoration style according to their own living habits and preferences. Of course, you can also listen to the proposal of the decoration company, and then consider it comprehensively.

2, the main demolition reform

Before the construction is repaired, the main body must be demolished and transformed, including our common wall removal, bricklaying, shoveling, and changing steel windows.

3, hydropower reform

After the completion of the demolition of the main body, it is necessary to start the concealed project and reform the hydropower. However, before the reconstruction, it is necessary to confirm whether the cold water pipes, hot water pipes, and line pipes are regular products. In addition, prior to the signing of the contract, various materials, brands, models, specifications, wall thickness, etc. should be indicated, and finally hydropower reform.

4, woodworking

After the hydropower transformation is completed, carpenters can enter the market. Woodworking projects include ceilings, wardrobes, wine coolers, partitions, doors and windows. In addition, the distance between the gypsum board and the wall should be separated by about 3mm to prevent cracking. The wool floor should be laid at 30 degrees or 45 degrees, and between the board and the board, 2-3 mm should be reserved and the joints should be staggered.

5. Mason (tiling)

After the carpentry is completed, the peatmakers can enter the field. The puddle project includes tiles that cover the balcony, kitchen and bathroom. In addition, before laying kitchen tiles, you must first set aside the hood.

6, brush wall paint

After the tiling is completed, the painter can enter the site. When painting, clean the wall first, wait until it is clean, and then paint again. If you want to stick wallpapers, you must surface-treat the walls before you can start pasting.

7, kitchen and toilet ceiling

After the paint brush is applied, the ceiling of the kitchen and bathroom is to be finished. Before the ceiling of the kitchen and bathroom, it is necessary to first purchase the moisture-proof ceiling lamp, the exhaust fan and other products, and reserve the outlet and the opening at the time of installation.

8, floor installation

After the ceiling is completed, floor installation can be performed. However, before installation, the area of ​​the pavement must be measured to see if the floor needs to be leveled for better installation.

9, furniture appliances approach

After the floor is installed, the furniture can be entered, but the corners of the furniture should be wrapped up and brought in lightly to avoid scratching the floor.

The article concludes: The relevant knowledge of new house renovation steps and processes is introduced here. If you need to know more information, please continue to pay attention to this site and we will have more exciting content.