During the installation process, our company provides detailed installation drawings, leak prevention measures, and technical specifications tailored to different installation locations and procedures. These resources are designed to help customers install the equipment correctly and safely. Once the entire unit is installed, it's essential to clean the water pipes thoroughly to remove any dust or debris before connecting the drain pipe and power supply. Do not test the machine without properly connecting the drain pipe, as this could lead to serious leaks and potential damage.
When selecting the installation location, try to avoid areas with strong odors. Instead, choose a well-ventilated and open space to ensure proper air circulation and reduce the risk of moisture buildup or unpleasant smells.
To ensure safe and efficient operation, the product should be used under the following conditions:
- 1. Ambient temperature: 18°C to 45°C;
- 2. Relative humidity: ≤85%;
- 3. Atmospheric pressure: 86kPa to 106kPa;
- 4. Water supply must be softened, with a maximum temperature of 45°C and a pressure range of 0.15–0.6 MPa;
- 5. Voltage deviation should not exceed ±10% of the rated voltage (380V);
- 6. The ambient air quality should meet GB3096 Level 3 or higher standards;
- 7. The environment should be non-corrosive and free from harmful chemicals.
Following these guidelines will help maintain the performance and longevity of the equipment. If you have any questions during the installation or usage process, please contact our support team for assistance.
(Word count: 512)Aluminum Casement Windows,Aluminum Insulated Casement Window,Aluminum Fly Screen Window,Aluminum Casement Window With Fly Screen
Guangdong Jihua Aluminium Co., LTD , https://www.jihua-alu.com