Renovation house order for house decoration process owners

After buying a new house, it will be renovated. The decoration is a complicated and long process. There are many steps in the whole process. There is a certain convergence between each step. The order of them must not be wrong, but the order is not well understood by the owners of the decoration. It is very confused, so what exactly is the home improvement process ? Let's take a look with Xiaobian.

Housing renovation process 1. Pre-measurement design

The first is to plan according to one's own habits, and to make a specific measurement of the own room, including the area touched by the detailed decoration process, especially the tiling area, wall paint area, wallpaper area, floor area, etc.; The size of each functional area, etc., according to the measured units can begin to do a reasonable layout design and decoration budget.

House decoration process 2. Main body demolition

The first step of construction is the main phase of demolition and renovation. According to the design drawings, concrete walls, base walls, shovel walls, demolition heaters, and steel window replacements are to be made. The main part of the dismantling and reform is to put the plan of the construction site first, dismantle the rubbish, and clean it up in time to ensure the cleanliness of the interior as well as to facilitate the construction. At this time, the finished door can be set, and the cabinet, hood, stove, and water heater can be determined.

House Renovation Process 3. Hydroelectric Reform

After the basic project is completed, the water circuit can be transformed. However, before this, the cabinet designer should come to the door to make the first measurement, and put forward some suggestions based on the location of the outlet and the hood of the hood. After the completion of the waterway reconstruction, the waterproofing of the kitchen, bathroom, and balcony will be done. At this time, the water heater must also be designed for the location of the power supply and the interface. On the wall under the basin, it is best to leave the power outlet for easy loading. The air-conditioning holes and power supply should be placed on the wall of the bedside as much as possible. The distance between strong electricity and weak points must be kept at 20 cm, which means that there must be a distance of 20 cm between the outlet and the cable.

House Renovation Process 4. Carpenter

Carpenters, bricklayers, and oil workers are the “three brothers” in the construction process. The order of operations is wood-tile-oil. The criteria for entry are who is dirty and who is on. In fact, carpenters, such as bag risers, decoration ceilings, plaster lines, and the like, can be considered in a sense as a fine link of the main demolition and reform. They themselves do not conflict with the transformation of the water circuit. Sometimes they need some. cooperation. Taking into account the kitchen and bathroom environment, the material of the stand-up tube must not be wood keel, even if the brush anti-corrosion coating does not work, it is best to use light steel keel, or red brick. Light steel keel provinces, but the most solid and easy to use is the red brick.

House decoration process 5. Tiling

The process of bricklayer work, in addition to the tiling of the wall and floor, also touched the installation of the door stone, marble window sill, and hardware. Passing the door stone and floor tiles can also be performed at the same time. The marble window sill should be installed after the window cover is completed. There is also a floor drain installation. The floor drain is the first one in the home improvement hardware and should be synchronized with the floor tile. After the kitchen tiles are laid, the hood can be installed. After these are done, you can start the second measurement of the cabinet. At the same time, you can purchase paint, wall paint, lacquer, diluted water, etc., as well as stick wallpaper.

House decoration process 6. Brush wall paint

The oiler should do the work of the bottom layer of the wall, brushing the top coat, painting the furniture, etc. If you stick wallpaper, you can do bottom layer disposal on the wall. If the walls are to be painted, the color must be noticed. The color of the extracted color is lighter than that of the color card. It must not be the same as the color card or deeper than it is. Otherwise, you will regret it. Because at least two coats of paint are used to paint the walls, some of them are still three times. The color of the wall will be deeper than the one layer.

Housing renovation process 7. Kitchen ceiling

The ceiling of the cabinet is the leading part of the installation process. The installation includes the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom. When the ceiling is to be set aside the head and hole, first install the water heater and Yuba, after installation, the ceiling edge can be better half-package water heater, which is more beautiful convergence. It is best to buy aluminum buckle ceiling, even if it is removed after many years, selling scrap aluminum is worth a lot of money. Although the pvc buckle board looks good, but the quality and performance are generally like. Buy buckle board, to ask the price of all-inclusive, do not buckle board, corner to buy, otherwise the installation fee is another calculation.

House decoration process 8. Kitchen cabinet equipment

After the ceiling is over, you can use the cabinet door-to-door device. There are also sinks, gas stoves, etc. installed at the same time as the cabinets are installed. Because the cabinets are a cooperating project, the hood, stove, and sink should be ordered in advance. Before the cabinet equipment, it is necessary to reconcile the property to pass the gas, because the gas stove needs to be tested after installation.

Housing renovation process 9. Wooden door equipment

Although the wooden doors were measured before, the installation was carried out on the second day after the cabinet was installed. If it is successful, the installation can be completed in one day. Finished doors should be installed before the floor, mainly because of the complex installation steps, hinges, door locks, door stoppers, door frames, etc., using a large number of tools, such as the first installed floor, bumps are difficult to avoid. Many of the owners’ homes are first installed on the floor and installed doors, and many small pits are found on the floor. The production period of the wooden door is generally one month, so after the main body is demolished and reformed, the wooden door manufacturers can measure the standard of the door opening.

Housing renovation process 10. Floor equipment

The floor can be laid on the second day after the wooden door is installed. Before laying, the ground level should be surveyed first. If it is uneven, some leveling will be needed. The floor will be cleaned and cleaned, and the water can not be cleaned. When laying, the floor must be cut. corridor. Cutting the floor in the room is a serious problem for the pollution of the wall, and the cut-off of artificial stone countertops in the cabinets is also in the corridor. It is only necessary to clean it after it is completed.

Decoration process

Home renovation process 11. Install the radiator

Installing a radiator is the easiest way to avoid negligence, mainly because it is easy to be fooled when buying. Pay attention to the installation list of the radiator, and see if the part of the seal is not the manufacturer's chapter. If it is the chapter of the installation team, and then agrees, then it basically means that you gave up the right to let the manufacturer responsible. Once there is an accident that has soaked the floor and flooded the home, manufacturers will absolutely shirk their responsibilities and it will be impossible for the installation team to find anyone. The so-called warranty, which can only be borne by the user, will not be accepted if it is not the manufacturer's chapter.

Home Improvement Process 12. Furniture Home Appliances, Soft Fittings

The decoration process has basically had the appearance of a home here, of course, if you want a more comfortable home, the furniture can not be less. After the above procedures are over, the beds, mattresses, wardrobes, shoe cabinets, sofas, dining tables, and other furniture can be put in place. TVs, washing machines, and other related home appliances should also enter the market. At this point, the entire renovation process will be completed. Now. In the end, you can use soft outfits, including curtains, decorative paintings, plants, craft ornaments, and more.

The article concludes: The above is the introduction of the sequence of the housing renovation process . Decoration is an orderly process. After understanding its steps, it is not easy to make mistakes during the renovation. It is hoped that the sharing of Xiaobian can provide some help for the owners in decorating the house. For more information, please pay attention to this site.

High Temperature And High Pressure Special Valves

Special valve refers to can be applied to a variety of special environment and adapt to a variety of complex conditions of the valve, is a very widely used in the national economic construction and development of a general mechanical products, in energy, chemical, medicine, agriculture, food, military and other industries are playing an extremely important role. With the in-depth promotion of industry 4.0, special valves have also entered a new stage of development, and the technology and market of special valves have also undergone new changes.
Compared with ordinary types of valves, special valves have obvious characteristics such as extremely complex internal flow, special structure, special materials and special uses. As a special valve in many valve types, it is applied to various special environments, can adapt to various complex working conditions, plays a special role and undertakes a particularly complex task. Therefore, special valves are often referred to as the "throat" of industrial pipes. More typical special valves are the main feed water regulator, pressure regulator spray valve, high pressure trap, Tesla valve, pilot Globe Valve, multistage pressure reducing valve, sleeve control valve, heart flap valve and so on. It is self-evident that the technical complexity of special valves is much higher than that of ordinary valves, which belong to high-end valve series both technically and in the market.

High Temperature And High Pressure Special Valves,Special Check Valve,High Pressure Ball Valve With Actuator,High Performance Butterfly Valves

WUXI KVC-VALVE , https://www.kvgatevalve.com