Warm laying of the concrete process

Electric floor heating laying process

1. Slot the wall and prepare to install the thermostat in the future.

2. Lay the line pipe in the open slot, and the control line of the floor heating will pass through here.

3. Clean the site and prepare for the laying of electric floor heating.

4, laying corner insulation board, blocking the heat to warm the corner conduction.

5, laying plastic extruded board, blocking the heat to warm the ground to distribute.

6, laying reinforced aluminum foil, used to reflect the warmth of upward heating.

7. Place a wire mesh on the aluminum foil paper to fix the above heating tube and increase the surface concrete adhesion.

8. Lay the electric heating pipe on the steel wire net and tie it tightly with a plastic cable tie.

9. Put the control line of the electric heating into the first line pipe and install the temperature control panel here.

10. Measure the electrical floor heating resistance of the paved shop with an ohmic rocking watch. If the value reaches 1500 megaohms, it will be qualified.

Warm water laying process

1. The floor of the living room, bedroom and bathroom has been laid warmly, the shape and color are quite good-looking, and the laps look very neat, and these pipes are one to the end without interruption.

2, in the shop when the pipe is not how to shop on how to shop, but to stick to the wire mesh shop. There are also work cards on the workers, which are generally only available to regular construction agencies.

3, when the shop is in a corner, there are also strict regulations. It is necessary to measure the distance and fix the position before fixing the coil. It seems that the construction process of this company is quite strict.

4, even in the parallel laying place should also strictly keep the distance between them, so that the ground can be more uniform heat, and the next white plastic ties are used to fix a section of a coil.

5, the coil is a good PEX tube, Ruihao is a good brand, and this tube has a memory function, even if it is accidentally stamped, it can also be restored to the original state.

6, in the heating water is divided into two ways to their respective rooms, in order to make the coil does not move, workers also use black plastic tube card to fix, so that the two tubes to maintain a certain distance.

7, from this point of view, the entire floor laying structure is very clear, insulation board, reflective film, wire mesh, coil, this layer of laying is not at all.

8. This is a control valve for heating, which is divided into several ways to transport warm water to various areas. A single black pipe looks clean and tidy, allowing the owner to understand the heating situation.

9. Although the mainframe has not yet been hung up, the workers have carefully plotted the location and the schematic diagram of each interface. The preparation work is done well, and naturally it can save a lot of trouble when installed.

10, because the owners of the gas consumption is quite large, so workers in the owner's advice after helping them to change a large gas meter, although only a small amount of effort, but the owners feel very gratified.