Prevent burying in concrete

At the critical point of the fine stone concrete pump, attention should be paid to lubrication. Some joints should be reinforced at any time. Check whether the hydraulic oil is enough or not. The following focuses on how the fine stone concrete pump should be inspected. Whether the safety valve of the fine stone concrete pump reaches the inlet of the cylinder or not, the basic criterion is to ensure its integrity and firmness. The solution is to replace the damaged tube immediately. In the inspection of fine stone concrete pumps, it should be done before and after use. This can detect faults in time. For example, the inspection of hydraulic components is done before any operation and repaired in time. In particular, the phenomenon of oil diarrhea is found. It is necessary to check all possible causes, such as safety valves for fine stone concrete pumps, steel pipes and hoses in hydraulic pressure. During the concrete pumping process of the fine stone concrete pump, the outlet end and the pouring surface of the hose bundle should be kept 0.5-1m to prevent it from being buried in the concrete. Be careful to cause the instantaneous pressure inside the pipe to increase and the pipe is wounded.

PN16 Din Water Supply Cpvc Pipes

Cpvc Pressure Rating,Astm Cpvc Pipe,Pressure Cpvc Pipe,Din Water Supply Cpvc Pipe

Zhejiang Huangyan Minghua Plastic Pipe Fitting CO.,LTD , https://www.pipefitting-mh.com